My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-07_HYDROLOGY - M1980244
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1980244
>
2015-12-07_HYDROLOGY - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 1:54:23 AM
Creation date
12/8/2015 10:36:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Hydrology
Doc Date
12/7/2015
Doc Name
Notification of High Grade Mill
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Angle holes—The holes are vertical. A survey of several companies determined that angle holes <br /> were not feasible. At the chosen location there was insufficient room on the bench to <br /> accommodate the drill rig in the necessary orientation. On the lower existing basin we could not <br /> find a rig that was capable of drilling/casing at the necessary angle and depth required to allow <br /> sufficient head and maintain appropriate distance to the liner. It should be noted that the installed <br /> wells are dimensionally similar with existing wells installed in the VLF and that similar flow <br /> rates under similar conditions rates have been well-proven over the last five years. <br /> Precipitation—precipitation is driven partly by exchange of CO2 and 02 with the atmosphere. In <br /> the wells the available surface area is substantially reduced (0.28 ft2 vs—100 ft2) and the <br /> potential depth is increased. The added head increased the infiltration rate. Precipitation may still <br /> occur in the heap due to the porosity, but it will be distributed over a 3D volume rather than a 2D <br /> plane that limits hydraulic conductivity. <br /> Monitoring/Rehab—Wells will be monitored and flows manually directed between wells. If <br /> conductivity wanes over time to an extent where the volume cannot be accommodated we plan to <br /> use our pad injection pump set up to inject solution at high pressure/volume to flush the area <br /> around the wells. This would be exactly the same as what we have been doing since 2010. <br /> If you have any questions please feel free to contact at 719-689-4048 or <br /> Christopher.Hanks(cr�,Newmont.com if you have any questions or comments. <br /> Regards <br /> Chris Hanks <br /> Chief Environmental Coordinator <br /> cc. Jeff Winterton and Meg Burt <br />
The URL can be used to link to this page
Your browser does not support the video tag.