Laserfiche WebLink
SECTION 2.03 LEGAL, FINANCIAL, AND COMPLIANCE <br />AND RELATED INFORMATION <br />2.03.2 Responsibilities <br />Oakridge commits to meet the responsibilities of Section 2.03.2 by specifically <br />complying with the use of procedures established by the standardized procedures set forth <br />in paragraphs "(3) and (4)" of this section. <br />2.03.3 Format and Supplemental Information <br />The information contained herein is both historical and current and is presented in a <br />format identifying each rule or section of the regulations followed by the appropriate <br />information. <br />All tests and analyses were conducted by qualified personnel and laboratories. The <br />various personnel and labs are appropriately identified below. The following is a listing <br />of all participants who gathered and/or analyzed technical data in the originalapplication <br />and subsequent revisions and renewals. This listing also includes preparers of this permit <br />document. <br />Individual/CompanySurvey <br />Air Photo Surveys1990-1992 mapping and topography generation <br />Dave Buckner (PhD)vegetation, (1982) gather baseline information and <br />wrote reclamation feasibility paper. <br />CDS Labsoils and groundwater (1981, 1982) procedures. <br />CHL Engineering & Draftingsurveying and mapping (2004-2006) <br />Core Labcoal flotation, water analysis (1982), ASTM <br />procedures. <br />CTE/F.M. Foxcoal analysis, soils analysis (1982) ASTM testing. <br />Dickinson Lab, Inc.coal quality sampling (1981) ASTM testing. <br />of El Paso <br />Darry A. Fergusoncertification, mapping, and permit compilation. <br />Registered Professional Engineer. 1992. <br />Abridged Permit Document3-1Permit Renewal RN04 4/2014 <br />