Laserfiche WebLink
FILE: 118.7 <br />INSPECTOR: Wanda Nickels <br />DRAINAGE: FAR EAST BUZZARD <br />4th QUARTER 2015 <br />TRAPPER MINING INC. <br />QUARTERLY SEDIMENT POND INSPECTION REPORT <br />SIGNATURE:�L���//—Lt <br />DATE OF INSPECTION: 11/18/2015 <br />POND IDENTIFICATION <br />Far East Buzzard #1 <br />Approximate water level: <br />Dry <br />Sediment level (% total storage): <br />10% <br />Outflow (cfs): <br />0 <br />Sediment marker (install or replace) <br />Inplace <br />Identification sign (install or replace) <br />Inplace <br />EROSIONAL: <br />Rills and/or gullies on downstream face. <br />NO <br />Rills and/or gullies on upstream face. <br />NO <br />Inadequate vegetation. <br />NO <br />Outlet channel erosion. <br />NO <br />Burrows. <br />NO <br />Erosion of toe. <br />NO <br />Water impounded against downstream toe. <br />NO <br />Other. <br />--- <br />STRUCTURAL: <br />Differential settling. <br />NO <br />Cracks, slides, or scarps. <br />NO <br />Seepage (specify location, color, value). <br />NO <br />Defective spillways. <br />NO <br />Other. <br />--- <br />APPURTENANT STRUCTURES: <br />Defective spillways. <br />NO <br />Dewatering device clogged. <br />NO <br />Cracking or crushing of pipes. <br />N/A <br />Other. <br />-- <br />COMMENTS: No problems noted. <br />