Laserfiche WebLink
1996 <br />1997 <br />1998 <br />1999 <br />225 140 100 45 <br />220 130 15 200 <br />105 145 165 30 <br />165 135 45 83 <br />Ave 15.2 12.2 4.9 6.0 <br />Max 22.5 14.5 16.5 20.0 <br />Year 1996 1998+ 1998 1997 <br />Min 3.8 6.8 0.0 0.0 <br />Year 1994 1994 1995+ 1995 <br />Count 7 7 7 7 7 <br />0 0 0 0 0 173 <br />0 0 0 0 0 65 <br />0 0 0 0 0 OI <br />0 0 0 0 0 10 <br />0.0 0.0 0.0 0.0 0.0 5.5 <br />0.0 0.0 0.0 0.0 0.0 17.3 <br />1999+1999+ 1999+ 1999+ 1999+ 1996 <br />0.0 0.0 0.0 0.0 0.0 0.0 <br />1999+ 1999+ 1999+ 1999+ 1999+ 1998+ <br />7 7 7 7 7 7 7 <br />220 205 110.8 <br />70 93 79.3 <br />45 245 73.5 <br />50 185I 67.3 <br />12.0 13.2 69.1 <br />25.0 24.5 110.8 <br />1994 1998 1996 <br />4.5 4.0 47.1 <br />1998 1995 1993 <br />7 <br />RECLAMATION COSTS EXHIBIT L <br />The worst case reclamation costs occur when the mining is taking place in the new lease area to the <br />south and there are 3 strips in various stages of activity and the entire existing lease area still requires <br />reclamation. Final seeding area = 29.8 acres from existing disturbance + 3 strips x 4 acres per strip + <br />3 acres from sediment pond and protection berm = 44.8 acres. <br />Worst case reclamation costs for this scenario are given below: <br />Berry Pit 3/02 29 <br />