Laserfiche WebLink
Mr. Brock Bowles <br />November 30, 2015 <br />Page 2 <br />3. There is discussion in Section 2.05.3(3) about the designs of ponds 007 through 015 but <br />there is no mention of Pond 018. Please add a discussion about Pond 018 or reference <br />Attachment 2.05.3(3)-28 in the text. <br />Response: Section 2.05.3(3) has been updated to include both a discussion about Pond <br />018 and a reference to Attachment 2.05.3(3)-28. <br />4. On page 2.05.3(3)-14, bullet g has been added. It states that all ponds will have a <br />keyway cut along the entire width of the dam as shown on Map 2.05.3(3)-6-1. The <br />current version of Map 2.05.3(3)-6-1 does not describe or point out the keyway. Please <br />amend the map to describe the keyway. <br />Response: Bullet g on page 2.05.3(3)-14 is an item in the currently approved PAP. <br />However, this item has been revised to remove reference to Map 2.05.3(3)-6-1. Also, <br />since Pond 018 is primarily incised, this structure will not have a keyway cut. <br />5. On page 2.05.3(3)-36, the BB Road Detour Design Details have changed. The current <br />permit has 21 bullets and the proposed revision has 16 bullets. Since the detour road has <br />already been reclaimed, please explain why the design details are being changed. <br />Response: The bullets for the BB Road Detour Design Details were inadvertently <br />removed. The text in Section 2.05.3(3) has been revised to restore the list currently <br />approved in the PAP. <br />Attachment 2.05.3(3)-28 <br />1. Based on the information presented in the proposed Attachment 2.05.3(3)-28 the <br />structure details associated with proposed ditches C4A and Ditch Pond 018 East were <br />completed without freeboard. There was no discussion in the provided text to serve as a <br />justification not to include freeboard in the proposed ditch designs. Per Rule <br />4.05.3(7)(b), diversion design shall incorporate freeboard no less than 0.3 feet. Please <br />provide detail designs which include freeboard of no less than 0.3 feet for the proposed <br />ditches C4A and Ditch Pond 018 East or provide a justification to the Division discussing <br />the reason designs without freeboard meet the requirements of Rule 4.05.3(7)(b). <br />Response: Revised detail designs which include freeboard of no less than 0.3 feet for the <br />proposed ditches C4A and Ditch Pond 018 have been included in Attachment 2.05.3(3)- <br />28. <br />AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER <br />A Touchstone Energy Cooperative <br />