My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-03_REVISION - M1985112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985112
>
2015-12-03_REVISION - M1985112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:32:58 PM
Creation date
12/3/2015 4:21:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
Revision
Doc Date
12/3/2015
Doc Name
Complaint CT05
From
DRMS
To
Loloff Mine
Type & Sequence
CT5
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 22, 2015 4R R", <br /> (� Mr. Peter Hays <br /> Environmental Protection Specialist <br /> State of Colorado <br /> Division of Reclamation, Mining, &Safety <br /> 1313 Sherman Street- Room 215 <br /> Denver, CO 80203 <br /> RE: Loloff Construction, inc. - Loloff Pit - File No. M-1985-112,'Responses to Letter"Dated <br /> April 23. 2015 regarding Groundwater Monitoring Data <br /> Dear Mr. Hays, <br /> BUJ&T Consulting, Inc. and Loloff Construction, Inc. have reviewed the letter dated April 23, 2015 <br /> regarding Groundwater Monitoring Data. The following are our responses to each of the <br /> numbered comments you provided in the letter: <br /> 1. The Division did not receive groundwater elevation data for the Monroe well, <br /> which is included in the approved groundwater monitoring plan. Please <br /> provide groundwater elevation data for the Monroe well and begin the required <br /> monthly well monitoring, if not already started by the Operator. <br /> Response: <br /> The well was reviewed to see if access could be gained to measure the water level in <br /> the well. Mr. Doug Derr met with the Monroe's and after trying to remove some of the <br /> existing equipment it was determined that since the materials were galvanized steel <br /> they did not want to continue as there were concerns that the existing <br /> equipment/materials might break. The Monroe's indicated that as tong as the pond <br /> continues to be recharged and tilled they had no problems with their well. <br /> 2. In the Responses to Second Adequacy Review Comments for TR-01, dated <br /> October 21, 2013, the Operator committed to providing the trigger level <br /> elevations from a 2-foot change from historical groundwater levels for each <br /> monitoring location with the groundwater data. The Division has not received <br /> the trigger level elevations for the monitoring locations with the groundwater <br /> date provided by the Operator. Please provide the trigger elevations for the <br /> monitoring locations with the groundwater data provided by the Operator. <br /> Please provide the trigger elevations for each monitoring well location. <br /> Response: <br /> The wells on the west side of the pit have been monitored which include the Parker, <br /> Harrell and Francis wells. Loloff Construction is working with Parkers on their existing <br /> well to come up with a solution to either re-drill that well or provide potable water <br /> from North Weld Water. If there is a drop of more than 2 feet in the Harrell and <br /> Francis wells, from the monitoring elevations provided in April 2015, Loloff <br /> Construction will continue to work with the well owners to provide a solution to any <br /> problems they may have with their wells. <br /> V 305 Denver Avenue—Suite D-Fort Lupton CO 80621 •Ph:303-857-6222-Fax:303-857-6224 <br />
The URL can be used to link to this page
Your browser does not support the video tag.