Laserfiche WebLink
McAtee Construction Company Harley Pit #1 <br /> Permit# M-1986-147 2015 Annual Report <br /> Notes: <br /> Please refer to the 2015 Annual Report Map for location of the areas of disturbance in the mine. <br /> We continued to remove material from stockpiles and the mined area. No reclamation is required <br /> at this time. The markings and colors noted in the text reference area on the map. The annual fee <br /> of $791.00 was mailed separately on 12/1/2015. <br /> (9) The partially reclaimed area (3.64 acres)that was seeded and the grass is beginning to grow. . <br /> (13) Weed control was done in June 2015 this year in accordance with the Weed Management Plan <br /> on the perimeter of the mine and spot work was done on the mine floor areas and roadways. Escort <br /> and 2-4-D was applied as needed. Weed control will continue in 2016. <br /> (10) Mining will continue on the mine face. We will continue to mine the area strip in previous years. <br /> (11) No reclamation is required next year, but we will resoiling and seed any area that become ready <br /> for reclamation. <br /> (18) The current bond is $71,755. Comparison of the evaluation done in 2010, was found to be <br /> adequate. This annual report shows that less area is disturbed at this time than allowed in the <br /> bond estimate. Reclamation is complete on 4.78 acres ± of the site and have 3.64 ac seeded. We <br /> feel the bond is adequate to cover all reclamation requirements for this year. <br />