My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-30_REVISION - M1976018 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976018
>
2015-11-30_REVISION - M1976018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:32 AM
Creation date
12/3/2015 4:20:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976018
IBM Index Class Name
REVISION
Doc Date
11/30/2015
Doc Name
Bond Estimate SI02
From
North Weld Gravel
To
DRMS
Type & Sequence
SI2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Task # 501 <br />1.000 <br />(DOZ-OC) <br />0.666 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3239 <br />Adjusted unit production: 526.99 LCY/hr <br />Adjusted fleet production: 1053.98 LCY/hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />2 Dozer(s) <br />$0.397/LCY <br />Total job time: 12.43 Hours <br />Total job cost: $5,198 <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.