Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 505 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GREELEY <br />Total one-way travel distance: 20.00 miles <br />Average Travel Speed: 45.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />$4,493.28 <br />$27.36 <br />Non- <br />Roadable <br />Equi.ment <br />Roadable <br />Equipment <br />0.44 <br />0.44 <br />0.44 <br />0.44 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.89 <br />0.89 <br />Total job time: <br />3.78 Hours <br />Total job cost: $4,521 <br />CIRCES Cost Estimating Software <br />