My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-30_REVISION - M1976018 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976018
>
2015-11-30_REVISION - M1976018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:32 AM
Creation date
12/3/2015 4:20:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976018
IBM Index Class Name
REVISION
Doc Date
11/30/2015
Doc Name
Bond Estimate SI02
From
North Weld Gravel
To
DRMS
Type & Sequence
SI2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task # 505 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GREELEY <br />Total one-way travel distance: 20.00 miles <br />Average Travel Speed: 45.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />$4,493.28 <br />$27.36 <br />Non- <br />Roadable <br />Equi.ment <br />Roadable <br />Equipment <br />0.44 <br />0.44 <br />0.44 <br />0.44 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.89 <br />0.89 <br />Total job time: <br />3.78 Hours <br />Total job cost: $4,521 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.