Laserfiche WebLink
yl <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. 1 <br /> ANGLOGOLD ASHANTI•(COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> CQA ACTIVITIES: <br /> 1) Field Activities: <br /> The following activities were observed: Placement and compaction of the Phase 1 &2 Structural Fill <br /> materials; placement,compaction, density testing and depth verification of Soil Liner Fill materials; pump <br /> monitoring at the LVSCS riser pipes;tertiary underdrain construction; leak detection construction; soil <br /> liner fill acceptance;geomembrane installation and acceptance; and remediation of underground <br /> workings. <br /> II) Laboratory Activities: <br /> Concrete testing, atterberg limits, moisture, compaction, permeability and sieve analysis testing <br /> continued. <br /> The following samples were collected: Phase 1 —Drain Cover Fill; 1-DCF-3-R <br /> Phase 1 —Soil Liner Fill; 1-SLF-12-R <br /> Cameron—Soil Liner Fill; SLF-183-C <br /> General Proiect Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held June 17,2015 (Amec Foster Wheeler, CC&V,Ames). Amec <br /> Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br /> Contractor Meeting. <br /> ➢ Ames daily safety meetings <br /> ➢ Amec Foster Wheeler daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates,reporting, and scheduling occurred between CC&V Projects,Amec Foster <br /> Wheeler, and Ames. <br /> Deliveries: None. <br /> CQA Monitor <br /> Submitted by: Date: June 30, 2015 <br /> Bobby Redd,El <br /> Project Resident --— <br /> Reviewed by: —` ~ Date: 171F A15) <br /> CC&V Projects <br /> Reviewed By: / _ Date: ii/z3/� <br /> Reviewed By: Date: <br />