My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-03_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-12-03_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 1:50:25 AM
Creation date
12/3/2015 4:17:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
12/3/2015
Doc Name
Final Report, QA Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yl <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. 1 <br /> ANGLOGOLD ASHANTI•(COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> CQA ACTIVITIES: <br /> 1) Field Activities: <br /> The following activities were observed: Placement and compaction of the Phase 1 &2 Structural Fill <br /> materials; placement,compaction, density testing and depth verification of Soil Liner Fill materials; pump <br /> monitoring at the LVSCS riser pipes;tertiary underdrain construction; leak detection construction; soil <br /> liner fill acceptance;geomembrane installation and acceptance; and remediation of underground <br /> workings. <br /> II) Laboratory Activities: <br /> Concrete testing, atterberg limits, moisture, compaction, permeability and sieve analysis testing <br /> continued. <br /> The following samples were collected: Phase 1 —Drain Cover Fill; 1-DCF-3-R <br /> Phase 1 —Soil Liner Fill; 1-SLF-12-R <br /> Cameron—Soil Liner Fill; SLF-183-C <br /> General Proiect Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held June 17,2015 (Amec Foster Wheeler, CC&V,Ames). Amec <br /> Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br /> Contractor Meeting. <br /> ➢ Ames daily safety meetings <br /> ➢ Amec Foster Wheeler daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates,reporting, and scheduling occurred between CC&V Projects,Amec Foster <br /> Wheeler, and Ames. <br /> Deliveries: None. <br /> CQA Monitor <br /> Submitted by: Date: June 30, 2015 <br /> Bobby Redd,El <br /> Project Resident --— <br /> Reviewed by: —` ~ Date: 171F A15) <br /> CC&V Projects <br /> Reviewed By: / _ Date: ii/z3/� <br /> Reviewed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.