Laserfiche WebLink
amet . ,.. <br /> CQA ACTIVITIES: <br /> 1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; SF, SSF, LID, and SLF sampling; clearing and grubbing; underground working <br /> remediation and confirmatory drilling; topsoil removal; and <br /> 11) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br /> continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> Soil Liner Fill Sample SLF169-C (Control sample) <br /> Structural Fill Sample SF113-R (Record sample) <br /> ➢ Underdrain Fill Sample 2UF2-R (Record sample) <br /> i► Select Structural Fill Sample 2SSF1-R (Record sample) <br /> General Proiect Items <br /> Meetings and Discussions: <br /> r The Weekly Contractor Meeting was held January 7, 2014 (AMEC, CC&V, Ames) <br /> Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects,AMEC, and Ames. <br /> Miscellaneous: None. <br /> Deliveries: None. <br /> Submitted by:_Eric-Lofenson — Date: January 13, 2015 <br /> Review d by: Date: January 13, 2015 <br /> Tim B rkhard <br /> Proje esident <br /> Phone: 7 T9-689-2986 <br /> CC&V Projects <br /> Reviewed By. Date: r 115 //5 <br /> Reviewed By: , l Date: ., 1s 11 <br /> 2015-01-10-mle2 weekly final Page 3 of 6 <br />