Laserfiche WebLink
3. Deciduous riparian woodlands <br /> 4. 150 trees, one caliper or large will be planted <br /> x. Grass Seeding: <br /> 1. Champ Big Bluestem <br /> 2. Little Bluestem <br /> 3. Side oats Grama <br /> 4. Buddalo Grass Western Wheatgrass <br /> 5. Slender Wheat Grass <br /> 6. While Clover <br /> xi. Portions of the north haul road will not be reclaimed <br /> e. Water Info <br /> L A 14 acres lake existed at the site prior to permitting,generated from previous <br /> mining <br /> ii. Total Water surface of reclaimed lakes is 92.5 acres <br /> 1. Less 10.6 acres of islands <br /> 2.) 1986 Technical Revision: <br /> a. Revised the number of phases and how many lakes were to be created and how the site <br /> would be graded. <br /> b. Mine 9 phases(Map) <br /> c. Create un number of various lakes <br /> i. 8 Total, 1 was pre-existing <br /> d. Approved March 20, 1986 <br /> 3.) October 1996: SO approval from Western Mobile, Inc.to Western Mobile Boulder, Inc. <br /> 4.) Inspection 12-09-2002 <br /> a. Mining is completed and the site is in the final stages of reclamation. <br /> b. Grading is very good <br /> c. Need to revegetate and plant trees <br /> d. Knap weed infestation <br /> e. The operator provided an augmentation plant to address water usage at the pit <br /> f. Need to Increase the Financial Warranty to$143,700.00 <br /> g. Report Contained COST ESTIMATE <br /> 5.) SO-03 approved July 5t', 2002 <br /> a. So from Western Mobile Boulder, Inc.to Lafarge West, Inc. <br /> 6.) January 31, 2003:TR-02 Submittal: <br /> a. Weed Management Plan: <br /> i. List of weed species <br /> 1. Primary weed is diffuse knapweed <br /> ii. Control Methods: <br /> 1. Annual Site reconnaissance <br /> 2. Follow-up inspections: <br /> 3. Types of methods: <br /> a. Herbicide <br /> b. Mowing <br /> c. Seeding <br /> d. Burning <br /> 7.) March 21, 2003 Addendum to TR submittal <br /> a. Diffuse Knapweed treatment: <br /> i. Mowing in spring to prevent seed production <br />