My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-03_GENERAL DOCUMENTS - M1977036
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977036
>
2015-12-03_GENERAL DOCUMENTS - M1977036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 2:28:39 AM
Creation date
12/3/2015 11:51:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977036
IBM Index Class Name
General Documents
Doc Date
12/3/2015
Doc Name
IMP CLOSEOUT FILE
From
DRMS
To
DRMS
Email Name
SDT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br /> SCRAPER TEAM WORK <br /> PROJECT IDENTIFICATION <br /> Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br /> Task#: 004 State :Colorado Permit/job# :M-1977-036 <br /> Date : 1211612009 County:Weld Abbreviation :none <br /> User: JLE Site :Greeley 35Th Avenue Mine Filename :M036-004 <br /> Permit or other job action :Warranty Estimate _ <br /> Task description :Topsoiling upland areas with on-site topsoil piles <br /> . <br /> HOURLY EQUIPMENT COST <br /> Shift basis : 1 per day <br /> Equipment Description <br /> Scraper work team-Scraper:Cat 627G w/push-pull <br /> -Push dozer:NA <br /> Support equipment-Load area :Cat D9R-9SU(2005) <br /> -Dump area :NA <br /> Road maintenance-Motor grader:CAT 14H <br /> -Water truck:Water Tanker, 5,000 Gal. <br /> Cost Breakdown : Scraper Work Team Support Equipment Road Maintenance Equipment <br /> Scraper Dozer Load area Dump area Grader Water truck <br /> Import data filename: scraper2 NA dozer NA grader misctruk <br /> % Utilization-machine : 100 NA 100 NA 20 20 <br /> -Ripper attachment: NA NA 10 NA 0 NA <br /> Ownerhip cost/hour: $68.97 NA $58.16 NA $41.79 $24.58 <br /> Operating cost/hour: $128.91 NA $101.59 NA $9.71 $7.29 <br /> Ripper op. cost/hour: NA NA $0.00 NA $0.00 <br /> Operator cost/hour: $38.72 NA $38.54 NA $38.91 $38.70 <br /> Unit subtotals : $236.60 NA $198.29 NA $90.41 $70.57 <br /> Number of units: 4 0 1 0 1 1 <br /> Group subtotals :1 Work: $946.41 Support : $198.29 Maintenance: $160.98 <br /> Total work team cost/hour: $1,305.68 <br /> .. ... .. <br /> MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume : 36,000 LCY factor: NA volume : 36,000 LCY <br /> Source of quantity take-off:Exhibit L, Adequacy Review#2 Response <br /> Source of estimated swell factor:NA <br />
The URL can be used to link to this page
Your browser does not support the video tag.