Laserfiche WebLink
sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br /> SCRAPER TEAM WORK <br /> PROJECT IDENTIFICATION <br /> Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br /> Task#: 004 State :Colorado Permit/job# :M-1977-036 <br /> Date : 1211612009 County:Weld Abbreviation :none <br /> User: JLE Site :Greeley 35Th Avenue Mine Filename :M036-004 <br /> Permit or other job action :Warranty Estimate _ <br /> Task description :Topsoiling upland areas with on-site topsoil piles <br /> . <br /> HOURLY EQUIPMENT COST <br /> Shift basis : 1 per day <br /> Equipment Description <br /> Scraper work team-Scraper:Cat 627G w/push-pull <br /> -Push dozer:NA <br /> Support equipment-Load area :Cat D9R-9SU(2005) <br /> -Dump area :NA <br /> Road maintenance-Motor grader:CAT 14H <br /> -Water truck:Water Tanker, 5,000 Gal. <br /> Cost Breakdown : Scraper Work Team Support Equipment Road Maintenance Equipment <br /> Scraper Dozer Load area Dump area Grader Water truck <br /> Import data filename: scraper2 NA dozer NA grader misctruk <br /> % Utilization-machine : 100 NA 100 NA 20 20 <br /> -Ripper attachment: NA NA 10 NA 0 NA <br /> Ownerhip cost/hour: $68.97 NA $58.16 NA $41.79 $24.58 <br /> Operating cost/hour: $128.91 NA $101.59 NA $9.71 $7.29 <br /> Ripper op. cost/hour: NA NA $0.00 NA $0.00 <br /> Operator cost/hour: $38.72 NA $38.54 NA $38.91 $38.70 <br /> Unit subtotals : $236.60 NA $198.29 NA $90.41 $70.57 <br /> Number of units: 4 0 1 0 1 1 <br /> Group subtotals :1 Work: $946.41 Support : $198.29 Maintenance: $160.98 <br /> Total work team cost/hour: $1,305.68 <br /> .. ... .. <br /> MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume : 36,000 LCY factor: NA volume : 36,000 LCY <br /> Source of quantity take-off:Exhibit L, Adequacy Review#2 Response <br /> Source of estimated swell factor:NA <br />