Laserfiche WebLink
United States Department of the Interior <br />67- <br />lOFFICE OF SURFACE MINING <br />RECLAMATION AND ENFORCEMENT <br />Casper Area Office <br />PO Box 11018�H 3 �150 East B Street, Room 1018 <br />Casper, WY 82602 <br />NOV 13 2015 <br />Michael Boulay, Director <br />Office of Mined Land Reclamation <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Approval of Partial Phases I, II, and III Bond Release, Roadside Portals, <br />Permit No. C-1981-041 <br />DRMS Proposed Decision and Findings of Compliance, October 8, 2015 <br />Dear Mr. Boulay, <br />This letter acknowledges the Office of Surface Mining Reclamation and Enforcement (OSMRE), <br />Denver Field Division's (DFD) receipt and review of the above Phase I, II, and III Bond Release <br />Proposed Decision document prepared by the Division of Reclamation Mining and Safety dated <br />October 8, 2015. DFD agrees with the findings and decision document and hereby provides <br />OSMRE concurrence for the above bond release action in accordance with 30 CFR 740.15 (d) <br />(3), and 30 CFR 906.30, Article IX, Section 24, of the State -Federal Cooperative Agreement. <br />DRMS's Proposed Decision documents the applicant's compliance with the approved Colorado <br />regulatory program at Rule 3.03.2. <br />The Phase I portion of this bond release applies to 22.2 acres on: Cameo Refuse Disposal Area <br />(CDRA) I Access Road; Cameo Borrow Area (CBA) 1 Sump; CBA 2 Pond 11; Pond 13 Flume <br />and Substation G; Ponds 6, 8, 9, and 10; North Decline Road Pond 7 Sumps and Diversion <br />Ditch; Haul Roads to CRDA 1, 2, and 3; 2 West Portals Access Road; Coal Gulch; North Portal <br />Diversion Ditch and Topsoil Pile 2; and the Coal Creek realignment. <br />The Phase II portion of this bond release applies to I36.5 acres on: South Lease Exploration; <br />North Decline, Channel, and Mine Dewatering System; North Decline Road, Pond 7, Sumps, and <br />Diversion Ditch; North West (NW) Intake; CRDA 1; CRDA 2 and Topsoil Piles; Haul Roads to <br />CRDA 1, 2, and 3; CBA 1; South Fan; 2 West Portals; 2 West Portals Access Road; Roadside <br />Borrow Area and Upper Diversion Ditch; Roadside Refuse Disposal Area; CBA 2 and Coal <br />Gulch; Coal Gulch; North Portal Area; North Portal Diversion Ditch and Topsoil Pile 2; <br />Substation B; and Coal Creek Realignment. <br />The Phase III portion of this bond release applies to 128.0 acres on: South Lease Exploration; <br />North Decline, Channel, and Mine Dewatering System; North Decline Road, Pond 7, Sumps, and <br />Diversion Ditch; NW Intake; CRDA 1; CRDA 2 and Topsoil Piles; CBA 1; South Fan; 2 West <br />Portals; Roadside Borrow Area and Upper Diversion Ditch; Roadside Refuse Disposal Area; <br />