Laserfiche WebLink
November 19, 2015 C-1981-019/Colowyo Coal Mine ZTT <br />Ditch along slope of reclamation. <br />GENERAL MINE PLAN COMPLIANCE: <br />Finalized sump. <br />The South Taylor pit was active during the time of the inspection with coal removal from coal seam B1 and spoil <br />movement. <br />Spoil placement/compaction in South Taylor Pit. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil stripping operations were ongoing at the time of the inspection. Topsoil was being placed at Topsoil Pile <br />16C. <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 4 of 7 <br />