Laserfiche WebLink
t <br />t <br />1 <br />t <br />1 <br />1 <br />i <br />10. Primary future <br />(Post -mining) <br />land use <br />(check one): <br />11. Primary present <br />land use <br />(check one): <br />-3- <br />Cropland(CR) Pastureland(PL) <br />_ - Rangeland(RL) , Forestry(FR) <br />Residential(RS) Recreation(RC) <br />- Developed Water Resources(WR) <br />Cropland(CR) — Pastureland(PL) <br />x Rangeland(RL) _ Forestry(FR) <br />- Residential(RS) Recreation(RC) <br />_ Developed Water Resources(WR) <br />12. Method of Mining: _ Quarry (QR) <br />X <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Buffer Zone, Rocky Flats <br />Plant, NREL Wind Research <br />Solution (SO) <br />12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br />Shovel excavates sand and gravel, loaded onto haul truck, on-site screening <br />crushing and washing. <br />13. On Site Processing: Solution (SO) Chemical (CH) _ Thermal (TH) <br />Heap Leach (HL) Vat Leach (VL) <br />14. Application Fee: <br />The application fee for Quarry mining is $2,325. <br />The application fee for Solution mining or any Chemical or Thermal Processing <br />is $3,100. <br />If none of these methods or processes are to be included in the operation then <br />application fee is $1,875. <br />The application fee for conversion to a 112 permit is $1,500. <br />112 Amendment application fee is $1,550. <br />the <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2)). <br />It shall be a provision of this permit that the operations will be conducted in <br />accordance with the terms and conditions listed in your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations in effect at the time the <br />permit is issued. <br />