Laserfiche WebLink
RULE 3 - PERFORMANCE BOND REQUIREMENTS <br />3.02 - Performance Bond Requirements for Surface Coal Operations <br />3.02.2 - Determination of Bond Amount 3.02-1 <br />3.02.3 - Period of Liability for Performance Bond 3.02-1 <br />3.02.4 - Form, Conditions, and Terms of Performance Bonds 3.02-2 <br />3.05 - Performance Bond Requirements for Coal Exploration <br />3.05.2 - Determination of Bond Amount 3.05-1 <br />3.05.3 - Period of Liability for Performance Bond 3.05-1 <br />3.05.4 - Form, Conditions, and Terms of Performance Bonds 3.05-1 <br />3.06 - Special Bonding Requirements for Mine Drainage Facilities <br />3.06.1 - Bond Requirements 3.06-1 <br />is <br />RULE 4 - PERFORMANCE STANDARDS <br />4.01- General Provisions <br />4.01.3 - Responsibility 4.01-1 <br />PR04 TOC - ii Revised August 2000 <br />TABLE OF CONTENTS <br />• <br />(Continued) <br />Page No. <br />2.05 - Minimum <br />Requirements for Operation and Reclamation Plans <br />2.05.2 - <br />Operation Plan - Estimated Area for Life of Operations <br />2.05-1 <br />2.05.3 - <br />Operation Plan - Permit Area <br />2.05-3 <br />2.05.4 - <br />Reclamation Plan <br />2.05-48 <br />2.05.5 - <br />Postmimng Land Uses <br />2.05-70 <br />2.05.6 - <br />Mitigation of the Impacts of Muting Operations <br />2.05-71 <br />1.06- Requirements for Permits for Special Categories of Mining <br />2.06.2 - <br />Experimental Practices Mining <br />2.06-1 <br />2.06.3 - <br />Mountaintop Removal Mining <br />2.06-1 <br />2.06.4 - <br />Steep Slope Mining <br />2.06-1 <br />2.06.5 - <br />Request for Variances from Approximate Original Contour Restoration <br />Requirements for Steep Slope Mining <br />2.06-1 <br />2.06.6 - <br />Prime Farmland <br />2.06-2 <br />2.06.7 - <br />Variance in Delay in Contemporaneous Reclamation Requirements <br />in Combined Surface and Underground Mining Operations <br />2.06.2 <br />2.06.8 - <br />Surface Coal Mating and Reclamation Operations on Areas, or Adjacent <br />to Areas, Including Alluvial Valley Floors. <br />2.06-3 <br />2.06.9 - <br />Augering <br />2.06-5 <br />2.06.10 - <br />Coal Processing Plants and Support Facilities not Located within the <br />Permit Area <br />2.06-5 <br />2.06.11 - <br />In -Situ Processing Activities <br />2.06-5 <br />• <br />2.08 - Permit Reviews, Revisions and Renewals and Transfer, Sale and Assignment <br />2.08.4 - <br />Revisions to a Permit <br />2.08-1 <br />2.08.5 - <br />Right of Successive Renewal <br />2.08-1 <br />2.08.6 - <br />Transfer, Assignment or Sale of Permit Rights <br />2.08-1 <br />2.10 - Maps and Plans <br />2.10.1 - <br />General Requirements <br />2.10-1 <br />2.10.2 - <br />Permit and Adjacent Areas <br />2.10-1 <br />2.10.3 - <br />Specific Information Requirements <br />2.10-1 <br />RULE 3 - PERFORMANCE BOND REQUIREMENTS <br />3.02 - Performance Bond Requirements for Surface Coal Operations <br />3.02.2 - Determination of Bond Amount 3.02-1 <br />3.02.3 - Period of Liability for Performance Bond 3.02-1 <br />3.02.4 - Form, Conditions, and Terms of Performance Bonds 3.02-2 <br />3.05 - Performance Bond Requirements for Coal Exploration <br />3.05.2 - Determination of Bond Amount 3.05-1 <br />3.05.3 - Period of Liability for Performance Bond 3.05-1 <br />3.05.4 - Form, Conditions, and Terms of Performance Bonds 3.05-1 <br />3.06 - Special Bonding Requirements for Mine Drainage Facilities <br />3.06.1 - Bond Requirements 3.06-1 <br />is <br />RULE 4 - PERFORMANCE STANDARDS <br />4.01- General Provisions <br />4.01.3 - Responsibility 4.01-1 <br />PR04 TOC - ii Revised August 2000 <br />