My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-01_GENERAL DOCUMENTS - C1992081
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1992081
>
2015-12-01_GENERAL DOCUMENTS - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:00 PM
Creation date
12/1/2015 9:22:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
General Documents
Doc Date
12/1/2015
Doc Name
Mid Term Review & Reclamation Cost Estimate (MT5)
From
DRMS
To
Hayden Gulch Terminal, LLC
Permit Index Doc Type
Findings
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Midterm Review <br />Hayden Gulch Loadout <br />C-1992-081 <br />This document presents the results of the Midterm Permit Review of the Hayden Gulch <br />Terminal, Inc.'s (HGTI) Hayden Gulch Loadout. The Colorado Division of Reclamation, <br />Mining and Safety (Division) conducted this review for the purpose of fulfilling the requirements <br />of the Colorado Surface Coal Mining Reclamation Act and the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining. <br />This Midterm Review was conducted to fulfill the requirements of Sections 2.08.3, 2.06.2(10), <br />2.06.3(4)(a), 2.06.5(3), 2.06.7(5) and 3.02.2(4). <br />Section 2.08.3 of the Regulations requires that the Division conduct a review of each permit <br />issued, prior to its midterm. Based on this review, for good cause shown, the Division may <br />require reasonable revisions or modifications of the permit provisions to ensure compliance with <br />the Act and Regulation. <br />Section 3.02.2(4) requires that the Division review the amount of the bond and the terms of <br />acceptance of the bond every 2 1/2 years. <br />Sections 2.06.2(10), 2.06.3(4)(a), 2.06.5(3) and 2.06.7(5) require that experimental practices, <br />mountaintop removal variances, variances from approximate original contour (AOC) and <br />variances from contemporaneous reclamation, respectively, be reviewed by the Division where <br />applicable during the Midterm Review. These sections are not applicable at the Hayden Gulch <br />Loadout, as no such practices or variances have been approved at the Hayden Gulch Loadout. <br />This Midterm Review consisted of a detailed review of the following document: <br />• The Hayden Gulch Loadout permit application, including stipulations and responses <br />• All revisions made to the permit since the last permit renewal (RN -4) <br />• The Hayden Gulch Loadout annual reclamation and hydrology reports <br />• Bond surety and reclamation cost estimate <br />• The Division findings documents and previous Midterm Reviews <br />• The Division's inspection reports <br />• Any notices of violations since the last permit renewal (RN -4) <br />SECTION I — HISTORY <br />The Hayden Gulch Loadout is located in Routt County, approximately two miles southeast of the <br />town of Hayden, Colorado. The Hayden Gulch Loadout was originally a part of the Hayden <br />Gulch Mine (CDRMS Permit No. C-1980-003), located approximately seven miles to the south <br />of the Hayden Gulch Loadout. The permit for the Hayden Gulch Mine was terminated on <br />October 23, 2006. The Loadout is currently in temporary cessation. The history of the Hayden <br />Gulch Loadout's permit is listed below. <br />Hayden Gulch Loadout -2- 10/26/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.