Laserfiche WebLink
Louis Head <br />Page 3 <br />November 25, 2015 <br />11. The pagination of section 2.05 was corrupted by TR -68, which revised a large section, <br />but not all, of the text. Currently section 2.05 comprises 157 pages which are numbered <br />as follows: <br />• Page 1 through 74 are numbered as such in the top right corner, with a footer in <br />three parts: "Section 2.05"; [Revision]; [Date]. <br />• Pages 75 through 103 are numbered at the bottom of the page as "2.05-61" <br />through "2.05-87". A revised date is also shown at the bottom right corner of <br />these pages. <br />• Pages 104 through 114 are numbered "88" through "98" in the top right corner, <br />with a footer in three parts: "Section 2.05 Part 2"; [Revision]; [Date]. <br />• Pages 115 through 157 comprise the figures for section 2.05 preceded by a <br />Figures Table of Contents. The pages are not numbered but are identified by <br />figure number. <br />Please correct these pagination errors. <br />12. Section 2.05.3(4) describes ponds, impoundments and diversions within the permit area. <br />Towards the end of the section the discussion concerns water within the mine workings, <br />and was written in the future tense about the planned reopening of the mine. <br />Please update the discussion to reflect actual conditions encountered during the <br />reopening of the mine as well as the current drainage plan within the mine. <br />13. A connectivity assessment was completed on behalf of NECC by Arcadis. Although the <br />assessment was not required by the Division, a copy of it was forwarded to the Division <br />(email correspondence from Ron Thompson, May 6, 2014). The assessment is <br />informative and would be of benefit to the PAP; reference to it could be made in the <br />discussion in section 2.05.3(4), and the document itself added to the PAP as an exhibit. <br />Please add this information to the PAP or comment on why it is excluded. <br />14. Section 2.05.3(8) describes the handling of non -coal processing waste. The text refers to <br />a disposal area shown on Map 21 (and also on Map 12). Observations during recent <br />inspections suggest that non -coal waste is now collected in dumpsters and hauled off-site. <br />The disposal area is shown within the boundary of the sediment drying area on Map 12, <br />which seems to be contradictory. The scrap storage area referred to in the text is not <br />shown on Map 12. Please revise section 2.05.3(8), and (if necessary) Maps 12 and 21, <br />to reflect current practice for the handling of non -coal waste. <br />15. Rule 2.05.4(2)(g) requires that the reclamation plan includes: <br />A description, including appropriate cross sections and maps, prepared in <br />accordance with 2. 10, of the measures to be used to seal or manage mine <br />openings, and to plug, case, or manage exploration holes, other bore holes, <br />