My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-24_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2015-11-24_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:53 PM
Creation date
11/30/2015 11:36:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
11/24/2015
Doc Name
Midtern Review & Findings
From
DRMS
Type & Sequence
MT7
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revision No. Approval Date Nature of Revision Bond <br />MR-87 11/15/2013 Update Ownership Info and Map No Change <br />MR-88 1/24/2014 Update Product Information No Change <br />MR-89 3/31/2014 Revise Topography and Sediment Control No Change <br />MR-90 6/20/2014 Permanent Structures and Utility Map $5,460.70 <br />MR-91 8/5/2014 Prairie Dog Removal No Change <br />MR-92 2/20/2015 Update Ownership and Control No Change <br />MR-93 5/27/2015 Withdrawn <br />MR-94 6/4/2015 Landowner Request to Reclaim Pond 11 No Change <br />MR-95 6/23/2015 Surface Ownership Update No Change <br /> <br />TR-63 6/3/2014 Trench Drain Design $72,918.00 <br />TR-64 11/11/2014 Trench Drain Design Revision $8,734.96 <br />TR-65 4/7/2015 Incorporate BB Detour Road $26,354.93 <br />TR-66 5/19/2015 Dryland Pasture Reference Area No Change <br />TR-67 5/19/2015 BB Road Restoration Plan No Change <br />TR-68 7/21/2015 Stream Buffer Variance Request No Change <br />TR-7 11/13/2014 NHN-001 East and West Ditch As-Built No Change <br /> <br />PR-8 3/18/2014 Revised Prime Farmland Reclamation No Change <br /> <br /> <br />SECTION III STATUS OF STIPULATIONS <br /> <br />There are no outstanding stipulations at the time of this midterm review. <br /> <br /> <br />SECTION V PERMIT VARIANCES AND SPECIFIC APPROVALS <br /> <br />The New Horizon Mine permit does not include a variance under Rules 2.06.2 (experimental <br />practices), 2.06.3 (mountaintop removal), and 2.06.5 (approximate original contour (AOC) for <br />steep slope mining). No variance from contemporaneous reclamation for combined surface and <br />underground mining operations (2.06.7) is needed. <br /> <br />New Horizon received a variance for disturbances within the designated stream buffer zones of <br />Tuttle Draw, Calamity Draw and Enstrom Draw. The variance was approved in TR-68. <br /> <br /> <br />SECTION VI BONDING SUMMARY <br /> <br /> <br />The Division updated the reclamation cost estimate with costs updated in October 2014 to reflect 2014 <br />CRG, Means and CDOT rates. As of November 24, 2015, the Division estimates the liability at the New <br />Horizon Mine to be $5,432,359.95. This estimate includes reclamation tasks identified in the permit and <br />includes costs for Technical Revisions 63, 64, 65 and Minor Revision No. 90, which are the revisions that <br />had an increase in liability since the estimate was last updated for the entire site with Bond Release No. 13 <br />New Horizon Mine -5- 11/25/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.