Laserfiche WebLink
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245-4101, FAX: (970) 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />RECEIVED <br />November 18, 2015 <br />Jason Musick NOV 2 4 1015 <br />Division of Reclamation, Mining & Safety Division of Reclamation, <br />1313 Sherman St., Room 215 Mining & Safety <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />MR -184, Smart Ditch liner, <br />Revised location of Culvert T -F1 <br />Permit C-1996-083 <br />Dear Mr. Musick: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />On behalf of Bowie Resources, LLC, enclosed is an application for a minor revision to revise the location of <br />temporary culvert T -F1. <br />Currently, pages App. B-101 and 102 show all temporary culverts except T -F1. To correct this error, this <br />revision will revise App. B-102 in order to show temporary culvert T -F1. The hydrology for T -F1 will not <br />be updated; previously it was sized to accept runoff from the upper diversion ditch. If installed this <br />winter, it will accept runoff from the top of gob pile #2 only, therefore, the current design in the permit is <br />adequate. <br />At this time, no additional bond will be posted. A bond for culvert T -F1 is currently in place for a length <br />of 60'. If it is necessary to extend the culvert beyond 60', another minor revision will be submitted. <br />No new disturbance will be created. <br />Please feel free to contact me if you have any questions. <br />Sincerely, <br />�. <br />-Y'"' <br />r✓rix, tx'/�- <br />Tamme Bishop, P.E. <br />Project Engineer <br />Cc: Bill Bear, Bowie Resources, LLC (electronically) <br />Enclosures: <br />Volume IX: Pages App. B-102 <br />