Laserfiche WebLink
0 <br />v <br />Job <br />U.S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />ReG\amavtoc <br />Mine Site Evaluation <br />State Program <br />1. Permittee/Perso&w)� v ;;tag 9. Permit Number 10. Permit Type <br />SENECA COAL C0111PANV, LLC C-94-082 pp <br />2. Address 11. Field Visit Date 12, Purpose 13. SRA Present <br />P.O. BOX 670 11/4/2015 lop ETI <br />'J <br />3. City 4. State 14, Permit Status 15. Site Status 16, Facili T e <br />CO <br />IIAYDEN ® 111C A t p <br />5. Zi Code 6. Phone Number <br />816391639 (970)176-5219 <br />7. Operator Name, if Different than Permittee <br />SENECA COAL COMPANY, LLC <br />8. Mine Name <br />FY -OAST <br />17. OSM Office # 18. CCID P, 19. Land Code <br />140 1-1 SG <br />20. M.S.H.A. 1D # 21. State Abbrev, 22. Count /Burrough <br />05-00304 CO Rotrrr <br />23. AVS Permittee Entity ID Number 24. State Office <br />247762 <br />25. Hours <br />4.0 a. Permit Review <br />2.0 b. Site Visit Time <br />4.0 c. Travel Time <br />6.0 d. Report Writing <br />26. Signature Block /� <br />t/174; -1--- 1 <br />27. Reviewiml� <br />Signature <br />Signature: <br />Review Date: -J U <br />mm • dd • )YYY <br />Is Supplemental MSB Page Used YM 0 <br />L Christine Qelka, ID#182 <br />Printed Name : <br />Date: 11/18/2015 <br />Permit Type -item 10 IP = lnledm Program PP = Permanent Program NP - No Permit <br />rurposo Iype Uooas -item a CCR..Citizen Complaint Referral (non -site visit <br />Oxx..Oversighl RFx..Reclamation Fees CC , Citizen Complaint (initial site visit) <br />Axx ..Assistance Fxx Federal Actions CCF ..Assistance <br />Joint inspection -Item 3 A joint Inspection is when a state Inspector accompanies an OSM Inspector at any Ume during the review of the mine site <br />Permit Status - Item 14 AB Abandoned All surface and underground coal mining adivitles have ceased and operator <br />A AcLve Coal m ning activlties occu Ring or perm'tted but not yet has left the s,te vrithoul completing reclamation as defined In 30 CFR 64011(g) <br />disturbed ASI Bond Forfeiture: Bond forfeiture officially in process or completed and redamation In <br />iN Inactive (Permanent Program Permit) Phase II completed or progress or not yet commenced <br />Temporary Cessation of Operations (Interim Program Pe(ml) A132 Partially Reclaimed Forfeiture Forfeited site where all bonds have been used to reclaim site, <br />Coat mining completed and reclamation activities initiated, but site not reclaimed to Program standards. <br />BR Bond Release Reclamation completed and State Regulatory A133 Recla med Forfeiture: Forfeited site that has been reclaimed to Program standards <br />Authority(RA) has released all of the bond (Phase 111 Release) NA Not Applicahte When site Is unpermitted. <br />Silo Status -Item 1s MC Mining Complete: No mining activity on site. site NS Non -Site Visit: Status of site not determined <br />NO No Disturbance. No coal mining and reclamation regraded and awailing bond release. Forfeiture Pending The RA Is pursuing actions to <br />operations have been started TC Temporary Cessation. The RA has granted FP revoke the permit, collect the performance bond(s), <br />EX Coal Exp'oralJon Coal expioratan operations have cessation of mining pursuant to 30 CFR andfor reclamation of forfeited site Is In progress. <br />started and where coal mining operatlons have not 6`161617 13(b). FR Forfeited and Reclaimed Forfeiture reclamation <br />begun P1 Phase I Release At least Phase I bond release completed <br />AP Adhre Coal Producing Coal surface mining granted for entire permitted area For inter.m FO Abandoned Site: Abandoned site that is permitted but <br />activities are occurring permits, partial bond release there Is no bond. <br />AN Active Non -Producing Active non producing facility P2 Phase Il Release At least Phase 11 bond release WC Wk)eal: Coal mining and reclamation operations have <br />such as tipple or preparation plant for the entire perm lted area or are taking place and the activity Is not covered by <br />N&I No kilning The Permit Status Is active site is not in P3 Phase III Release: Reclamation completed and the required permits from the RA <br />Temporary Cessation. no surface coal mining the RA has released all bond <br />adlvlty and silo not regraded , <br />Facility Type Codes - Item 16 D Ancirary (Haulroad Conveyor, and/or Ralls H Exploration Permits K. -Government Financed Construction Exemption <br />A.. ,Surface E Refuse and/or Impoundment I Nolico or Intent to Exp'ore L .Remining site permitted under 30 CFR 785.25 <br />B ..Underground F Loading Facility andror Tipple J ,F_xerrpI 16 and Z3 <br />C . Preparation Plant 0. Stockpiles <br />Small Buslness Regulatory Enforcement Falmass Act (SBREFA) <br />Your Comments are Important <br />The Sma11 Business and Agriculture Regulalory Enforcement Ombudsman end 10 Regional Fa'moss Boards were established to receive commants from small businesses about Federal Agency <br />ardorcement adtons. The Ombudsman w,'I ernuaay evauals the enforcement adwites and role oath ageruys respon"enoss to sme7 rws ness. It you area small bus;ness (atwwass with 500 or <br />roxer empkryeas InCudng those of aff:iates) and with to comment on the ordoroament or compFanoo ad;v4ias of OSM can 1-Se&REC-FAIR (1.988.134-3247) <br />Page 1 <br />