Laserfiche WebLink
*1 <br />Mr. Zach Trujillo <br />November 20, 2015 <br />Page 5 <br />ITEM 49. The sampling sites for the East Fork of Jubb Creek are still unclear. The map says that they <br />are currently monitored, but they are not listed in the table. Please revise the map or the table, as <br />appropriate. <br />Response: Sites EFJC-97 and EFJC-04 on Map IOB have been updated to indicate that they are not <br />current monitoring locations. <br />ITEM 50. Response is adequate. <br />ITEM 51. Response is adequate. <br />ITEM 52. Response is adequate. <br />ITEM 53. Response is adequate. <br />ITEM 54. Response is adequate. <br />ITEM 55. In the text, exhibits, and maps of the PAP, Colowyo will need to account for page changes <br />from other revisions (e.g., TR -105) that were submitted after PR -04 was submitted but were (or will <br />likely be) approved before PR -04 is approved. <br />Response: Text and map approvals that have occurred under TR -105 and TR -106 have been <br />incorporated into PR -04 accordingly. These specific changes have been identified on the change of index <br />sheet. <br />ITEM 56. On Map 11, the Rail Loop Pond is mislabeled as the Loop Pond, and the Stoker Siding Pond is <br />lacking a reference to the design exhibit. Please revise the map to address these omissions. <br />Response: The Rail Loop Pond label on Map 11 has been corrected. <br />ITEM 57. Many dozens of pages in ST/LW Rule 2 have old footers. Some back to 2006. Colowyo <br />needs to update them. <br />Response: Pages Rule 2, Page 17 through Rule 2, Page 93 has been reformatted to remove section and <br />page breaks. This action corrected the footer dates. <br />ITEM 58. In Collom Rule 4, on page 18 there is an error in the first paragraph of Section 4.09. "Item and <br />Item 2" needs to be revised as appropriate. <br />Response: The reference to Exhibit 23, Item I has been corrected. <br />ITEM 59. In Collom Rule 4, on page 19 there is an error in the second paragraph of Section 4.13. "Final <br />reclamation Collom Pit will continue through 2040" needs to be revised by adding "of' and a period. <br />Response: The text in the second sentence, second paragraph of Section 4.13 has been corrected. <br />AN EQUAL OPPORTUNITY/AFFIRIPiATIVEA:'TION EMPLOYER <br />A Touchstone Energy° Cooperative <br />