My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-11-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:56 PM
Creation date
11/30/2015 8:45:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/27/2015
Doc Name
Weekly CQA - Weeks ending 11/07/2015 and 11/14/2015
From
Newmont/CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) WEEKLY REPORT <br />amec <br />foster <br />wheeler <br />Owner: <br />Project: <br />Location: <br />Contractor: <br />Cripple Creek & Victor Gold Mining Co. <br />Squaw Gulch Valley Leach Fill (VLF) <br />Cripple Creek & Victor Gold Mine, CO <br />Ames Construction, Inc. <br />Project Number: 74201125N0 <br />Week Ending: November 7, 2015 <br />Reporting Period: 11.01.2015 through 11.07.2015 <br />Days <br />SMTWT <br />F <br />S <br />Work Shifts <br />DDDD <br />D=Day Shift N=Night Shift W= Weather <br />Ambient Temperature Ranges During Week <br />Weather Conditions During Week: <br />Highs: 37°F to 55°F <br />Lows: 21°F to 32°F <br />Cloud Cover: Partly Cloudy to Mostly Cloudy <br />Precipitation: None <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />I) Earthworks <br />'"*Amec Foster Wheeler field professional monitored fill material temperatures during fill placement. <br />Average temperatures were above 32°F. All construction materials placed were verified as <br />suitable, and construction methods were in accordance with project technical specifications.** <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat dozer <br />placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br />compacted the fill area. <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />Subgrade: <br />Phase 1 areas dozed to finished grade were compacted per project plans and specifications. <br />See attached figure for approved subgrade. <br />
The URL can be used to link to this page
Your browser does not support the video tag.