My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-11-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:56 PM
Creation date
11/30/2015 8:45:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/27/2015
Doc Name
Weekly CQA - Weeks ending 11/07/2015 and 11/14/2015
From
Newmont/CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Irir <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />I) Field Activities: <br />The following activities were observed: Placement and compaction of the Phase 1 Structural Fill <br />materials; subgrade acceptance; placement, compaction, density testing, depth verification and <br />acceptance of Soil Liner Fill materials; geomembrane installation and acceptance; Drain Cover Fill <br />placement; and pump monitoring at the LVSCS riser pipes. <br />II) Laboratory Activities: <br />Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />The following samples were collected: Cameron — Soil Liner Fill; SLF-202-C <br />General Protect items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held November 10, 2015 (Amec Foster Wheeler, CC&V, Ames). <br />Amec Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />> Ames daily safety meetings <br />➢ Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: None. <br />CQA Monitor <br />Submitted by: <br />Bobby Redd, El <br />Project Resident <br />,04( <br />Date: November 19, 2015 <br />Reviewed by: Date: <br />CC&V Projects / <br />Reviewed By: l c Date: f /15 <br />Reviewed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.