My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-11-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:56 PM
Creation date
11/30/2015 8:45:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/27/2015
Doc Name
Weekly CQA - Weeks ending 11/07/2015 and 11/14/2015
From
Newmont/CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Soil Liner Fill: <br />A Cat skidsteer, a Cat excavator with a roller attachment and Cat smooth drum rollers compacted <br />SLF surface in preparation for geomembrane deployment. <br />Cat 740 haul trucks transported SLF from the Phase 1 stockpile to stations H24+00 to H26+00. A <br />GPS equipped Cat D7 dozer and a GPS equipped Cat D6 dozer placed SLF between stations <br />H20+00 to H26+00. A Cat skidsteer placed SLF in the vicinity of station F28+00. Cat smooth <br />drum rollers compacted the fill areas. <br />Cameron SLF processing continued. <br />All of the above Soil Liner Fill material was placed, graded, and compacted per the project plans <br />and specifications. Moisture content, density testing and depth verification were performed per <br />project specification prior to surface acceptance and geomembrane installation. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1. Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />See attached figure for approved DCF. <br />Crushed Ore Fill: <br />Cat 793 haul trucks delivered Crushed Ore to station 11+00 of the ADR haul road. The Crushed <br />Ore was used to continue a 100' lift to load the PSSA to the 9550' elevation. <br />Underground Workings: <br />Confirmatory Drilling: <br />UG #6679: Sandvik 700 — 5.0 hours, 500LF. Further remediation required. <br />Remediation: <br />UG #6673: Cat dozers continued removing shot rock to prepare for geogrid subgrade. <br />Further remediation required. <br />UG #6539: A Cat excavator removed shot rock in preparation for concrete plug. <br />Additional voids were encountered. Upon further investigation, it was determined that the <br />working remediation will be geogrid instead of concrete. Began preparation for geogrid <br />subgrade. Further remediation required. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: None. <br />Tertiary Underdrain: None. <br />Leak Detection: <br />Phase 1 leak detection complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.