Laserfiche WebLink
It is our intention to get Crossfire back into the pit as soon as possible,so would it be possible to allow them to <br /> work in the center of the permit,away from the boundary,until this approval is achieved? The boundaries are <br /> in place,and the center area is large enough to avoid any boundary issue.To ensure that there is no problem, <br /> we will not have any mining activities,including excavation,within 30 feet of the East and South boundaries <br /> (your Segments 1 and 2),or southwest of the roads in the Southwest corner of the permit area,until we have <br /> all agreed to the resolution of our problems. This reduces the area to 8.85 acres,or with the 0.98 acres in <br /> dispute,to a total of 9.83 acres. We will put markers up to ensure that neither we nor Crossfire go past those <br /> temporary lines. <br /> Lucas,Thank you for your help and understanding, and again I apologize for not getting all these facts to you <br /> earlier. <br /> Sincerely, <br /> JimHelmericks <br /> M85-001 <br /> MAP SHOWING THE 30 FOOT OFFSET ON THE SOUTH AND EAST AND THE SW CORNER <br /> �E��� <br /> 0.1IV Or <br /> • <br /> 0.95 A <br /> • ►����� 1.38 • <br /> ♦����♦ 5.10 •cres <br /> /���� ♦ Stock— <br /> • Mining and piles non <br /> ►��i���i�i*i� Proce sin. mInl <br /> • <br /> 0.98 acre- ►•••������•• 1,•� <br /> Non—mining 1 *40. <br /> • <br /> • <br /> Gael <br /> 0.51 acres <br /> ►_do no affect <br /> 1,22 acres <br /> 0.5 "Ai fflp non—rilning <br /> no of <br /> Incl. r•'mai <br />