Laserfiche WebLink
Table 4a <br /> WATER ACCOUNTING MEASUREMENT DATA <br /> Evans#2 Pit-Stonewall Springs Quarry <br /> Pueblo,CO <br /> April 1,2015 to March 31,2016 <br /> (1) (2) (3) (4) (5a) (5b) (6) (7) (8) (9) (10) <br /> Plan Year Exposed Date Method Amount of End of Month Date Date Lagged AGUA <br /> 2015 Water Surface of of Aggregate Dust Control Pumping for of Pumping for of Stream Replacement <br /> Month Area Determination Measurement Production Meter Reading Dust Control Reading Dewatering Reading Depletions Provided <br /> (acres) (tons) (gallons) jgallons) (g_allons) (acre-feet) (acre-feet) <br /> April-15 <br /> May-15 <br /> June-15 <br /> July-15 <br /> August-15 <br /> September-15 <br /> October-15 <br /> November-15 <br /> December-15 <br /> January-16 <br /> February-16 <br /> March-16 <br /> Notes: <br /> (1)ENTER: Periodically measured/determined total exposed water surface area bas (6)ENTER: Date of dust control meter reading. <br /> (2)ENTER: Date of water surface area measurement/determination. (7)ENTER: Estimated use for dewatering. <br /> (3) ENTER: Method used for water surface area measurement/determination. (8)ENTER: Date of dewatering meter reading. <br /> (4)ENTER: Amount of aggregate production in tons. (9)ENTER: Lagged stream depletion from AWAS. <br /> (5a)ENTER: End of month meter reading on metered use for dust control-July throu (10)ENTER: Amount of Replacement water provided. <br /> (5b)ENTER: Metered use for dust control-April through June only. <br />