My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-25_HYDROLOGY - M2008080
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008080
>
2015-11-25_HYDROLOGY - M2008080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 1:47:58 PM
Creation date
11/27/2015 8:15:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
HYDROLOGY
Doc Date
11/25/2015
Doc Name Note
May 19, 2015 through March 31, 2016
Doc Name
Substitute Water Supply Plan Amendment - May 19, 2015 through March 31, 2016
From
DNR Water Resources
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Journey Ventures Pit <br /> Operational Losses VIban ria Vwi.0 LLC <br /> Table 2 <br /> Submitted by: <br /> Paul Weiss <br /> 5255 Ronald Reagan Boulevard,Ste.220 <br /> Johnstown,CO 80534 Ph:970-221-5159 <br /> Percentage of Aggregate Water Retained Water Used for Water Pumped Total Operational <br /> Month Annual Production' Production'(tons) in Product(ac-ft) Dust Controls(ac-ft) for Batch Plant(ac-ft) Consumptive Uses(ac-ft) <br /> Apr-15 <br /> May-15 8.3% 0 0.00 0.02 2.00 2.02 <br /> Jun-15 8.3% 0 0.00 0.00 1.02 1.02 <br /> Jul-15 8.3% 0 0.00 0.00 0.38 0.38 <br /> Aug-15 8.3% 0 0.00 0.00 0.35 0.35 <br /> f <br /> Year 1 Total 91.7% 250,000 7.36 2.26 4.10 13.72 <br /> Year 2 Total 100.0% 250,000 7.36 4.48 0.00 11.84 <br /> 'Annual and monthly aggregate production is estimated based on discussions with J2 Contracting <br /> 2Water retained in product is applying a 4%moisture content as the mining at the site is in the wet. <br /> 3Monthly dust control based upon 4000 gallons per day.All water used for dust control is assumed 100%consumed. <br /> - 4Batch plant usage expected to occur in April,May and June.All water used at the batch plant is assumed 100%consumed. <br /> sTotal operational consumptive use is combination of water retained in product,used at batch plant, and dust control. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.