My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-20_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2015-11-20_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:48 PM
Creation date
11/23/2015 12:43:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
11/20/2015
Doc Name
Mid Term Review & Reclamation Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
MT5
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Remaining Tasks MT5 <br />Site: Hayden Gulch Loadout Permit Action: MT5 <br />PROJECT IDENTIFICATION <br />Task #: A01 State: Colorado <br />Date: 11/19/2015 County: Routt <br />User: JHB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1992081 <br />Abbreviation: None <br />Filename: C081 -A01 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />006 <br />007 <br />011 <br />015 <br />018 <br />019 <br />020 <br />021 <br />024 <br />025 <br />028 <br />031 <br />032 <br />033 <br />034 <br />037 <br />040 <br />041 <br />045 <br />046 <br />047 <br />501 <br />502 <br />503 <br />504 <br />505 <br />506 <br />507 <br />508 <br />509 <br />Regrade Rail Loop <br />DOZER <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />79.85 <br />$58,346.00 <br />$38,928.00 <br />$2,103.00 <br />$744.00 <br />$972.00 <br />$2,315.00 <br />$7,916.00 <br />$596.00 <br />$2,018.00 <br />$5,962.00 <br />$2,385.00 <br />$95,139.00 <br />$19,278.00 <br />$145.79 <br />$26,317.00 <br />$740.00 <br />$21,457.00 <br />$2,894.00 <br />$190,577.99 <br />$3,611.00 <br />$10,795.20 <br />$9,492.00 <br />$3,578.00 <br />$5,710.00 <br />$40,674.00 <br />$182,482.00 <br />$9,549.00 <br />$58,796.00 <br />$48,441.00 <br />$16,822.00 <br />$27,189.00 <br />$12,244.00 <br />$7,945.00 <br />Regrade Rail Spur <br />DOZER <br />54.93 <br />Regrade Facilities Area; Office/Parking Lot <br />DOZER <br />5.94 <br />Rip Facilities Area <br />RIPPER <br />2.03 <br />Rip Haul Road HGLF-HR1 <br />RIPPER <br />2.65 <br />Regrade Haul Road HGLF-HR1 <br />DOZER <br />6.34 <br />Finish Grade Disturbed Area <br />GRADER <br />56.63 <br />Regrade Truck Loop Pond <br />DOZER <br />1.68 <br />Regrade Rail Loop Pond <br />DOZER <br />5.70 <br />Regrade All Ditches <br />DOZER <br />8.41 <br />Regrade Leach Field <br />DOZER <br />6.73 <br />Replace Topsoil on Rail Loop and Facilities Area <br />SCRAPERI <br />122.73 <br />Replace Topsoil on Rail Spur <br />SCRAPERI <br />24.87 <br />Seal Alluvial Wells HGDAL3 and 4 <br />BOREHOLE <br />0.00 <br />Drill Seed Mix #1 <br />REVEGE <br />5720 <br />Drill Seed Mix #2 <br />REVEGE <br />2.40 <br />Drill Seed Mix #3 <br />REVEGE <br />42.90 <br />H droseed Mix #3 <br />REVEGE <br />2.00 <br />Demolish and Remove Structures <br />DEMOLISH <br />0.00 <br />Clean Sediment from Ponds Once During Liability <br />Period <br />TRUCKI <br />7.01 <br />Site Maintenance Over the Ten -Year Liability <br />Period <br />SITEMAINT <br />ENANCE <br />80.00 <br />Mob/Demob equip. for Reclamation of Loadout <br />Area and TAHR <br />MOBILIZE <br />3.60 <br />Mob/Demobilization for Pond Removal <br />MOBILIZE <br />3.60 <br />Mob/Demobilization for Maintenance and Pond <br />Cleaning <br />MOBILIZE <br />3.60 <br />Rip TAHR <br />RIPPER <br />55.40 <br />Remove TAHR Surface Material to Pit <br />SCRAPERI <br />104.56 <br />Grade TAHR to Blend <br />GRADER <br />66.61 <br />Replace Topsoil from Stockpile A to TAHR <br />Stations 114 to 216 <br />SCRAPERI <br />33.69 <br />Replace Topsoil from Stockpile C to TAHR <br />Stations 92 to 144 <br />SCRAPERI <br />27.76 <br />Replace Topsoil from Stockpile D to TAHR <br />Stations 76 to 92 <br />SCRAPERI <br />9.64 <br />Replace Topsoil from Stockpile E to TAHR <br />Stations 40 to 76 <br />SCRAPERI <br />15.58 <br />Replace Topsoil from Stockpile F to TAHR <br />Stations 16 to 40 <br />SCRAPERI <br />7.02 <br />Replace Topsoil from Stockpile G to TAHR <br />Stations 0 to 16 <br />SCRAPERI <br />4.55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.