Laserfiche WebLink
Job Condition Correction: <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Site Altitude: 7500 feet <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Scraper <br />Push Dozer <br />Source <br />-4.00 <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Net Correction: <br />0.830 <br />NA <br />Travel Time: <br />Road Condition: <br />Firm, smooth, rolling, <br />dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />3800.00 <br />-4.00 <br />3.00 <br />-1.00 <br />2972 <br />1.32 <br />Haul Time: 1.32 Minutes <br />Return Route - <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />3800.00 <br />4.00 <br />3.00 <br />7.00 <br />2240 <br />1.82 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 734.18 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 2 <br />Unit cost: $1.432 <br />1.82 <br />Minutes <br />4.74 <br />Minutes <br />60937 <br />LCY/Hour <br />2 <br />Scraper(s) <br />609.37 <br />LCY/Hour <br />1,218.73 <br />LCY/Hour <br />Team(s) Total job time: 9.64 Hours <br />/LCY Total job cost: $16,822 <br />