My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-20_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2015-11-20_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:48 PM
Creation date
11/23/2015 12:43:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
11/20/2015
Doc Name
Mid Term Review & Reclamation Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
MT5
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile A to TAHR Stations 114 to 216 <br />Site: Hayden Gulch Loadout Permit Action: MT5 Permit/Job#: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 504 State: Colorado Abbreviation: None <br />Date: 11/19/2015 County: Routt Filename: C81--504 <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />COSTShift basis: 1 per day <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br />Cost Breakdown: Scraper Work Team Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $1,745.26 <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$110.90 <br />NA <br />NA <br />NA <br />$42.03 <br />$52.28 <br />Operating cost/hour: <br />$243.12 <br />NA <br />NA <br />NA <br />$17.47 <br />$30.77 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA <br />$24.47 <br />$27.88 <br />Unit Subtotals: <br />$387.59 <br />NA <br />NA <br />NA <br />$83.96 <br />$110.94 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,550.36 <br />Support: <br />$0.00 <br />Maint: <br />$194.90 <br />Total work team cost/hour: $1,745.26 <br />MATERIAL QUANTITIES <br />Initial volume: 47,700 <br />CCY Swell factor: 1.000 <br />Loose volume: 47,700 <br />LCY <br />Source of estimated volume: <br />Seneca II -W Permit Table 21-3 <br />Source of estimated swell factor: <br />Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,100 lbs/LCY <br />Struck Volume: 24.00 <br />LCY <br />Material description: Earth - Loam <br />Heaped Volume: 34.00 <br />LCY <br />Rated Payload: 81,600 pounds <br />Average Volume: 29.00 <br />LCY <br />Payload Capacity: 38.86 LCY <br />Adjusted Capacity: 29.00 <br />LCY <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />1.00 Minutes <br />0.60 Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.