My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-20_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2015-11-20_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:48 PM
Creation date
11/23/2015 12:43:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
11/20/2015
Doc Name
Mid Term Review & Reclamation Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
MT5
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Condition Correction: <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Site Altitude: 6400 feet <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Scraper <br />Push Dozer <br />Source <br />3.00 <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Net Correction: <br />0.830 <br />NA <br />Travel Time: <br />Road Condition: <br />Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />2000.00 <br />3.00 <br />4.00 <br />7.00 <br />1362 <br />1.54 <br />Haul Time: 1.54 minutes <br />Return Route - <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />2000.00 <br />-3.00 <br />4.00 <br />1.00 <br />2963 <br />0.79 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 885.50 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $1.055 <br />0.79 <br />minutes <br />3.93 <br />Minutes <br />734.96 <br />LCY/Hour <br />2 <br />Scraper(s) <br />734.96 <br />LCY/Hour <br />734.96 <br />LCY/Hour <br />Team(s) Total job time: 122.73 Hours <br />/LCY Total job cost: $95,139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.