Laserfiche WebLink
Task description: Regrade Rail <br />Site: Hayden Gulch Loadout <br />PROJECT IDENTIFICATION <br />Task #: 019 <br />Date: 11/19/2015 <br />User: JHB <br />BULLDOZER WORK <br />Pond <br />Permit Action: MT5 <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Utilization % <br />$131.86 NA <br />$184.48 100 <br />$0.00 0 <br />$38.01 NA <br />$354.34 <br />$354.34 <br />MATERIAL QUANTITIES <br />Initial Volume: 3,000 <br />Swell factor: 1.125 <br />Loose volume: 3.375 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />-10% <br />150 feet <br />1,2432 LCY/hr <br />6,400 feet <br />Compacted fill or embankment 0.9 <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Permit/Job#: C1992081 <br />Abbreviation: None <br />Filename: C81-019 <br />