Laserfiche WebLink
Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />0.750 <br />(AVG.) <br />1.200 <br />(CAT HB) <br />1.100 <br />(50% SL) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />1.438 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 1.0634 <br />JOB TIME AND COST <br />401.75 LCY/hr <br />803.5 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.889/LCY <br />Total job time: <br />Total job cost: <br />560.05 Hours <br />$399,984 <br />