Laserfiche WebLink
BULLDOZER WORK <br />Task description: Regrade and Rip 6 North Main Pad <br />Site: Foidel Creek Mine Permit Action: MT7 Permit/Job#: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 016 <br />Date: 11/5/2015 <br />User: JLE <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - IOSU <br />Horsepower: 574 <br />Blade Type: Semi -Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C056016 <br />Total unit Cost/Hour: $356.00 <br />Total Fleet Cost/Hour: $356.00 <br />MATERIAL QUANTITIES <br />Initial Volume: 8,954 <br />Swell factor: 1.090 <br />Loose volume: 9,760 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />50 feet <br />2,748.7 LCY/hr <br />Consolidated stockpile 1.0 <br />7,000 feet <br />2,400 lbs/LCY <br />Weight description: Clay and gravel - Dry <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Utilization % <br />Ownership Cost/Hour: <br />$131.86 <br />NA <br />Operating Cost/flour: <br />$184.48 <br />100 <br />Ripper op. Cost/Hour: <br />$1.65 <br />15 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $356.00 <br />Total Fleet Cost/Hour: $356.00 <br />MATERIAL QUANTITIES <br />Initial Volume: 8,954 <br />Swell factor: 1.090 <br />Loose volume: 9,760 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />50 feet <br />2,748.7 LCY/hr <br />Consolidated stockpile 1.0 <br />7,000 feet <br />2,400 lbs/LCY <br />Weight description: Clay and gravel - Dry <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />