Laserfiche WebLink
MR -281 <br />A Relocation and Corehole WCO28. <br />9/8/2014 <br />None <br />MR -282 <br />Text Excavation, Initial Support and <br />9/17/2014 <br />Staging. <br />None <br />MR -280 <br />WCR Offset Drilling <br />9/2/2014 <br />$194,435.00 <br />MR -279 <br />Monitoring Well Relocation. <br />8/18/2014 <br />$10,487.27 <br />MR -278 <br />WCR Supplemental Corehole II. <br />6/12/2014 <br />$42,989.00 <br />MR -277 <br />WCR Supplemental Corehole Disturbed <br />5/28/2014 <br />Area Modification. <br />$54,347.00 <br />MR -276 <br />WCR Supplemental Coreholes. <br />4/25/2014 <br />$86,629.00 <br />MR -275 <br />WCR Coal Coreholes III. <br />2/27/2014 <br />$25,253.00 <br />MR -274 <br />Employee Coal Loading Area. <br />2/12/2014 <br />$1,142.00 <br />TR -83 <br />Mine Plan Revision for Wolf Creek <br />12/4/2014 <br />Reserve Initial Development. <br />None <br />MR -273 <br />2 Main North Thickener Underflow <br />12/30/2013 <br />Borehole. <br />None <br />MR -272 <br />TRO Coal Quality Coreholes 5-10. <br />1/21/2014 <br />$43,882.00 <br />MR -271 <br />Borehole Road Modifications. <br />11/22/2013 <br />$1,321.00 <br />MR -270 <br />7 -Right Thickener Underflow Borehole <br />12/13/2013 <br />and Pipeline. <br />$8,563.00 <br />MR -269 <br />TRO Coal Quality Coreholes. <br />12/30/2013 <br />$25,163.00 <br />MR -268 <br />Portal Waste Transfer Station Expansion. <br />10/30/2013 <br />None <br />MR -267 <br />EMD Water Monitoring Wells. <br />10/17/2013 <br />$15,153.00 <br />SECTION III — STATUS OF STIPULATIONS <br />One stipulation (Stipulation 64) was complied with the issuance of Permit Renewal No. 6 (RN -06). No <br />other stipulations are currently active for this site. <br />Stipulation 64 was attached to the permit through TR -67, approved on November 13, 2009. Twentymile <br />Coal Company is approved to construct the Refuse Disposal Area Expansion in accordance with the <br />designs approved in Technical Revision No. 67. Twentymile Coal Company had requested to provide <br />bond for the increased disturbance area in increments. The first increment, "Initial Bonded Disturbance" <br />of 50.0 acres, is limited to construction of 30.3 acres of refuse pile expansion, 2.4 acres of haul road <br />corridor, 5.9 acres of unclassified stockpile, 3.5 acres of topsoil stockpile, .04 acres of stockpile haul <br />corridors, and 7.5 acres of construction of RDA 10 and RDA 11 ditches, as shown on Map C-102 <br />(11/13/2009). Prior to disturbance of the Refuse Disposal Area expansion beyond the Initial Bonded <br />Disturbance, Twentymile Coal Company was required to submit additional bond adequate for <br />disturbances associated with bonding increments I and II. No disturbance associated with bonding <br />increments I and II was to have occurred prior to submittal and Division approval of additional bond. <br />Foidel Creek Mine -4- 11/23/2015 <br />