Laserfiche WebLink
BULLDOZER WORK <br />Task description: Regrade and Rip Waste Rock Pad and Adjacent Areas <br />Site: Foidel Creek Mine Permit Action: MT7 Permit/Job#: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 11/3/2015 County: Routt <br />User: ME <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: C056003 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - IOSU <br />Horsepower: 574 <br />Blade Type: Semi -Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $131.86 <br />NA <br />Operating Cost/flour: $184.48 <br />100 <br />Ripper op. Cost/Hour: $11.02 <br />100 <br />Operator Cost/Hour: $38.01 <br />NA <br />Total unit Cost/Hour: $365.36 <br />Total Fleet Cost/Hour: $365.36 <br />MATERIAL QUANTITIES <br />Initial Volume: 50,981 <br />Swell factor: 1.125 <br />Loose volume: 57,354 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />200 feet <br />946.0 LCY/hr <br />Compacted fill or embankment 0.9 <br />0% <br />7,000 feet <br />2,550 lbs/LCY <br />Weight description: Earth - <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Source <br />AVG.) <br />