Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Midterm Review No. 7 (MT7) Cost Estimate <br />Site: Foidel Creek Mine Permit Action: MT7 Permit/Job#: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 11/6/2015 County: Routt <br />User: ME <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C056-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />016 <br />017 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />026 <br />027 <br />Earthwork - Backfilling and Rough Grading <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />$489,717.00 <br />$40,561.00 <br />$54,788.00 <br />$64,584.00 <br />$3,485.00 <br />$4,416.00 <br />$14,841.00 <br />$1,742.00 <br />$1,823.00 <br />$332.00 <br />$40,111.00 <br />$16,297.00 <br />$27,192.00 <br />$3,185.00 <br />$13,635.00 <br />$2,934.00 <br />$834.00 <br />$165.00 <br />$2,541.00 <br />$11,719.00 <br />$7,293.00 <br />$3,935.00 <br />$4,683.00 <br />$60.00 <br />$395.00 <br />$3,751.00 <br />$914.00 <br />Backfill and Regrade Portal/Office Area <br />DOZER <br />476.40 <br />Regrade Shop/Warehouse/Parking/Stoker Areas <br />DOZER <br />118.37 <br />Regrade and Rip Waste Rock Pad and Adjacent <br />Areas <br />DOZER <br />149.96 <br />Regrade and Rip Tipple, Stockpile Pads and <br />Substation Areas <br />DOZER <br />176.77 <br />Regrade and Rip Explosives Bunker and Storage <br />Area <br />DOZER <br />9.54 <br />Regrade and Rip Rail Loop Corridor <br />DOZER <br />12.09 <br />Regrade and Rip East Mine Area PM Bay, <br />Laydown Area <br />DOZER <br />40.62 <br />Regrade and Rip 'Brown Palace" Office Area <br />DOZER <br />4.77 <br />Regrade and Rip Trai ing Center Area <br />DOZER <br />4.99 <br />Regrade, Spread Gravel Pad and Rip Rock Dust <br />Tank Area <br />DOZER <br />0.91 <br />Regrade and Rip Fish Creek Tipple Facilities Area <br />DOZER <br />54.89 <br />Regrade and Rip Fish Creek Borehole Area and <br />Treatment Ponds <br />DOZER <br />44.61 <br />Regrade Batch/Weigh/Loadout System <br />DOZER <br />79.36 <br />Regrade l ORT Pad <br />DOZER <br />9.29 <br />Regrade Eastern Mining District Vent Shaft Pad <br />DOZER <br />39.79 <br />Regrade and Rip 6 North Main Pad <br />DOZER <br />8.24 <br />Regrade 18 Right Pad Area <br />DOZER <br />2.34 <br />Backfill and Regrade West Haulroad Truck Scale <br />Foundation an <br />DOZER <br />0.48 <br />Backfill and Regrade Truck Loadout and Tunnel <br />DOZER <br />7.42 <br />Backfill and Regrade Wash Plant II Area <br />DOZER <br />16.48 <br />Regrade 18 Left Pad and Road <br />DOZER <br />20.52 <br />Regrade 6 North Main Pipeline Corridor, Road <br />Corridor, and D <br />DOZER <br />11.07 <br />Regrade 6 Right Thickener Underflow Pad, Road, <br />and Corridor <br />DOZER <br />13.17 <br />Regrade 18 Left Trench Increments <br />DOZER <br />0.18 <br />Regrade 19 Right Pad and Ditch Increments <br />DOZER <br />1.15 <br />Regrade 16L Grout Borehole Pad and Access Road <br />DOZER <br />10.55 <br />Regrade Drill Pads an Mud Pits Exploration Holes <br />TWC001-007 <br />DOZER <br />2.57 <br />