My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-20_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2015-11-20_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:48 PM
Creation date
11/20/2015 11:29:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
11/20/2015
Doc Name
Review Memo Associated with SL-16 Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
SL16
Email Name
JDM
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT <br />BULLDOZER WORK <br />Task description: Grade spoil side of pit ramp <br />Site: New Horizon Mine Permit Action: SL 16 <br />PROJECT IDENTIFICATION <br />Page 19 of 157 <br />Permit/Job#: C1981008 <br />Task #: 007 State: Colorado Abbreviation: None <br />Date: 11/19/2015 County: Montrose Filename: C008-007 <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9U <br />Horsepower: 405 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$72.57 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $253.73 <br />Total Fleet Cost/Hour: $507.47 <br />MATERIAL QUANTITIES <br />Initial Volume: 81,639 <br />Swell factor: 1.000 <br />Loose volume: 81,639 LCY <br />Source of estimated volume: Map 3.022-5 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />952.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />-20% <br />5,700 feet <br />2.900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />CRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.