My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-19_REPORT - M1978279
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1978279
>
2015-11-19_REPORT - M1978279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 9:37:28 AM
Creation date
11/20/2015 8:15:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978279
IBM Index Class Name
REPORT
Doc Date
11/19/2015
From
Flag Resources, Inc.
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Annual Fee/Report
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 3.95 seeded w/ 3.14 w/topsoil 3.14 mulched w/ 0 <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: 4.44 fertilized w/ NA replacement 6" rate(tons/ac): 2.0 <br /> apvd fertilizer: depth (in.): <br /> Seed hydro Fertilizer Mulch <br /> application application Hydro application Hydro <br /> method: sprayed method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES 1 );l /X <br /> If"YES", indicate the weed species, control area, control type,application rate and treatment date on the rcport map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? YES Ng XIX\ <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES )QR X1)6 <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br /> Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? XXX XX N/A <br /> 17. Are all hazardous materials stored within approved spill containment structures? XXL( XIX N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES xs4 506 <br /> 19. Is your basis for legal right to enter still valid? YES ) <br /> 20. Does your permit require you to submit monitoring information annually? NO )9(11 <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br /> boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. <br /> UPDATED MAP ATTACHED: Yes <br />
The URL can be used to link to this page
Your browser does not support the video tag.