Laserfiche WebLink
Revenue Mill Certification <br />Table of Contents <br />1. Introduction <br />2. Mill Design Discussion <br />3. Mill Construction, Modification and Test Operation <br />4. Water and Slurry Handling System and Environmental Protection <br />5. Chemical Handling System and Containment <br />6. Tailings Chemistry and Water Quality at Tailings Embankments <br />7. Tailings and Waste Rock Handling and Final Placement <br />8. Conclusions <br />Appendices <br />1. Mill Certification Maps <br />2. Tailings SPLP Tests <br />3. Tailings Embankment Well Tests <br />4. Tailings Laboratory Gradation, Compaction and Strength Parameter Results and Slope Stability <br />Analysis of Tailings Embankments <br />5. Tailings Management Manual <br />Revenue Mill Certification Page 2 of 20 <br />