Laserfiche WebLink
Total reclamation costs are as follows: <br />Bulldozer (d-6 incl. mob) <br />Tractor (with disc) <br />Tractor (with seed drill) <br />Rock Scaling <br />6 ton Straw Mulch <br />Total estimated reclamation cost <br />40 hours @ 125/hour <br />10 hours @ 95/hour <br />10 hours @90/hour <br />1 day @ 800/day <br />applied/crimped 250/ton <br />=$5000.00 <br />=$ 950.00 <br />=$ 900.00 <br />=$ 800.00 <br />=$1500.00 <br />=$9500.00 <br />This cost estimate includes fuel, mobilization, operator and associated labor <br />