Laserfiche WebLink
Chevron <br />%. <br />%. <br />November 9, 2015 <br />Julie Justus Chevron North America <br />Regulatory, Health & Exploration and Production Company <br />Environment Specialist (A Chevron U.S.A. Inc. Division) <br />MCBU 760 Horizon Drive Suite 401 <br />Grand Junction, Colorado 81506 <br />Telephone: 970.257.6042 <br />Email: Jlustus@chevron.com <br />Division of Reclamation, Mining and Safety <br />Attn: Minerals Program <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Re: Annual Report and Annual Fee <br />Chevron Shale Oil Company, a division of Chevron U.S.A. Inc. <br />Permit No. M-2006-039 North Clear Creek Construction Materials Mine <br />Garfield County, Colorado <br />In accordance with the regulations of the Division of Reclamation, Mining and Safety, Chevron <br />U.S.A. inc. hereby files its annual report and annual fee for the subject mine. <br />Preceding Year <br />The North Clear Creek Construction Materials Mine was opened in March of 2008 and the mine <br />has been in operation since that time. No material was removed from the mine FY 2015 and no <br />new reclamation or revegetation activities were initiated. A noxious weed control program has <br />been in place since the inception of the mine and the site is regularly monitored for noxious <br />weeds. No weed treatments were necessary or conducted at the mine in 2015. Existing <br />stormwater management controls are monitored at regular intervals and maintained as needed. <br />The Mine is currently in Intermittent Operation status as approved by DRMS in November of <br />2012. <br />A check in the amount of $323.00 for the annual fee, along with a survey map of the current <br />mine showing the disturbed areas are enclosed. <br />