My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-10_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2015-11-10_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:26 PM
Creation date
11/18/2015 9:42:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
11/10/2015
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company
Inspection Date
10/28/2015
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Erosion at EP1 inlet. Pond construction at West Pit reclamation. <br />GENERAL MINE PLAN COMPLIANCE: <br />Subcontractors were on site performing pond cleanings. See Hydrologic Balance Section for additional details. <br />OTHER (SPECIFY): <br />The continuous miner was being deconstructed at the time of the inspection. Charles Tipp stated that operations of <br />the continuous miner in the South Taylor Pit have been completed for the time being. <br />ROADS Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />The access road to West Pit Pond, East Taylor Pond and West Taylor Pond has been regraded prior to the <br />inspection. Minor erosion along the road prior to the drainage sumps observed during the OSM oversight has been <br />filled and smoothed. <br />TOPSOIL Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil was being placed along the current West Pit reclamation. Multiple trucks were on site placing the soil <br />along premeasured markers to ensure topsoil depth requirements are met. Tilling operations were occurring along <br />the upper slope areas where topsoil placement has finished. <br />Topsoil stripping was occurring in the drainage just west of the South Taylor Pit and being transported and placed <br />at Topsoil Pile 16C. MR-144 approved the stripping and expansion of Topsoil Pile 16C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.