Laserfiche WebLink
2.8 ELK CREEK DRAINAGE RECLAMATION <br />When the Elk Creek mine facilities are reclaimed, the Elk Creek culvert will be removed and the <br />drainage reconstructed. The current sediment control system consisting of ditches and ponds will <br />also be removed. To protect the Elk Creek drainage and prevent the addition of additional sediment <br />to the streamflow, Oxbow will have to use alternative sediment control measures such as topographic <br />roughness, small sediment traps, straw wattles, silt fence, wood logs, mulching as appropriate to <br />control runoff from the reseeded slopes located above the reclaimed stream channel. <br />If available, Salix willow species, such as S. exzgua and S. geyeriana and S. monticola and Narrowleaf <br />Cottonwood Popular an <br />gustifolia can be planted among the reconstructed rock protected drainage and <br />wet fringe areas to provide additional erosion control and wildlife habitat. <br />RN -06 H -11 Revised July 2013 <br />