Laserfiche WebLink
Oxbow Mining LLC <br />Elk Creek Mine <br />Hole Number: GVB- LW07 -02 Project ID.: Elk Creek Mine Gob Vent Boreholes <br />Lease Number: COC -61357 (State or Federal) Surface Owner: USFS <br />Date Commenced: 18- Jun -06 Date Completed: 7- Jul -06 <br />Contractor: WDC Drilling, Inc. Rig Type: Gefco 90K <br />Cored: <br />Geologist: Ken Ball/ D. Allen Date: <br />15- Oct -06 <br />Toolpusher: Kevin Jones <br />Driller: Alan Taylor Truck Driver: <br />Robert Labahn <br />Helper: James Timms <br />Kevin Lewis <br />Marvin Eldridge <br />Bill Spain <br />Coordinates: N. 16094.03 E. <br />26150.74 <br />NA <br />Location: Township, Range & Section: <br />SE 1/4 Sec. 35, T. 12 S., R. 91 W. <br />Ground Elevation: 7807' Collar Elevation: <br />Geophysical Logging Contractor: <br />Geophysical Log Measured From: Ground <br />Elevation <br />X <br />Total Depth: 1720' Probe Depth: <br />1640' <br />Fluid Level: NA <br />Casing Type: steel, T &C <br />Size: <br />9 5/8" <br />Casing Type: slotted steel, T &C <br />Size: <br />7 <br />Depth: 1494' Recovered (Y or N): <br />N- cemented <br />No. of Bags: 15 yds porrtland for annulus <br />Depth: 1434 -1720' Recovered (Y or N): <br />N -loose <br />Interval: to surface <br />Bit Information <br />Rock Sent To: NA <br />Surface Casing 17" Tri -cone (14" casing) from 0 -20' <br />Main Hole 12 1/4" Tri -cone to 1494' <br />Core: <br />Bottom Hole 8 3/4" Tri -cone to 1720' <br />Footage Plugged: 1720' <br />Cored: <br />NA <br />Drilling Medium: Air: <br />Sta -Foam 202/Water: <br />Mud: Foam Injection: <br />Depths: 0 -20' <br />20 -1720' <br />Lost Circulation Depths: <br />NA <br />Regained ? (Y or N): <br />Water Invasion Depth or Intervals: <br />NA <br />Estimated Inflow Rates: <br />Gas Invasion Depth or Interval: <br />NA <br />Geophysical Logging Contractor: <br />Jet West Geophysical; Welenco; Century Geophysical <br />Logs Run: Gamma: <br />X <br />Neutron: <br />Temperature: <br />Density: X <br />Resistivity: <br />X <br />Caliper: X <br />Other (SP, Foc. Elec., Drift, Dep., Sonic): - 2 <br />gyro deviation surveys: +/- 40' @ 280 deg. <br />Hole Cemented( Y or N ),Type: <br />Y <br />No. of Bags: 15 yds porrtland for annulus <br />Interval: to surface <br />Coal Core Sent To: NA <br />Rock Sent To: NA <br />Comments: Hole drilled into gob pos - longwalling. Mine void not encountered. Drilled hole <br />100' past projected D2 elevation with no sign of void. Installed 207.5' slotted casing below 80' <br />solid; 7" casing overlaps 62' inside 9 5/8" casing. <br />Two deviation surveys, two surface re- surveys confirm correct location and depth. <br />Halliburton attempts to frac strata at mine horizon with 24,000 gallons water. No pressure built <br />Methane pump set up on hole, but did not draw sufficient amount of gas to run. Pump pulled. <br />9 5/8" casing abandon to surface with 21 supersacks plug qel, 3 sacks (10') cement Auaust. 2006. <br />