My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-16_REVISION - M1983194
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2015-11-16_REVISION - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:21:11 PM
Creation date
11/17/2015 9:17:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
11/16/2015
Doc Name
Documents for SO02
From
Daub & Associates, Inc.
To
DRMS
Type & Sequence
SO2
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Barbara Coria <br />November 9, 2015 <br />Page 6 <br />This data indicates that no subsidence has been observed to date. The mine plan going <br />forward is controlled by the BLM with a stipulation in the mining permit that the recovery of <br />nahcolite is limited to 221 tons per foot of cavern length. Natural Soda plans to maintain the <br />spacing between caverns similar to the historical spacing of 200 feet. This results in an extraction <br />ratio of less than 40%. <br />The concern is that the "Applicant provide information sufficient to demonstrate that the <br />stability of any structures located within two hundred feet of the operation or affected land will <br />not be adversely affected." Given the historical data from the first 25 years of operation during <br />which no measurable surface subsidence has been observed, the expectation is that if the basic <br />mine plan is followed in the future, no subsidence will occur and no surface structures will be <br />adversely impacted. <br />The structures of concern are the gas pipelines and electric power transmission lines not <br />owned by Natural Soda. Figure 1 shows the power lines and gas pipelines not owned by Natural <br />Soda. Natural Soda has extended a natural gas pipeline from the south up to the plant site; this is <br />shown in yellow with blue dots. There is another gas pipeline traversing the southeast corner of <br />the lease area that travels from the American Soda plant site to the existing well pads owned by <br />WPX Energy Rocky Mountain, LLC (WPX). This line traverses within 300 feet of the surface <br />location of the wellheads for wells 10H and 11H and approximately 1,000 feet from the solution <br />mining caverns. As no subsidence is expected above caverns 10H or 11H, no impact is expected <br />at the WPX pipeline at this location. <br />The overhead electric lines above the plant wellfield areas were installed by White River <br />Electric Association (WREA), were paid for by Natural Soda, and are owned by WREA. WREA <br />maintains the power lines and installs additional lines as needed as the wellfield expands. WREA <br />is compensated for this service by their sale of electric power to Natural Soda. Since no subsidence <br />is expected, no impact on the power lines is expected. Should tilt occur in the power lines, WREA <br />and NS would replace the pole(s) as needed. <br />The gas -well pads owned and operated by WPX Energy Rocky Mountain, LLC (WPX) <br />have been developed subsequent to the development of the solution mining by Natural Soda under <br />a cooperative agreement. WPX has federal oil and gas leaseholds that largely overlap Natural <br />Soda's sodium lease boundaries. The attached letter from WPX illustrates the cooperative working <br />relationship between the two parties. <br />The historical record at Natural Soda where no subsidence has been recorded after 25 years <br />of production suggests that any subsidence will be slow to develop. Full extraction of a seam, as <br />is characteristic for longwall coal mining operations, can result in fully developed subsidence <br />within a year or two of mining. With extraction of less than 50% of the mining horizon, most <br />often no subsidence is detected. In shallow deposits, subsidence can develop over individual <br />caverns, but when the depth of cover is over 500 feet, localized subsidence above a single cavern <br />Agapito Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.