Laserfiche WebLink
c <br />Vendor# `15-0 I S Batch# Approver _iy Ra-e.d.sv" (Print Name) Datej(fs- --- -- <br />Contract/P0# Amount oZ I % • GO ❑ Invoice Has Multiple Codes <br />GL# PL# Org# 55V1,/ I. O Obj# (i •1VO &S - <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 <br />REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- 1877 -3/3 <br />Site Naine: -JENKi NS <br />County �0 �- F—+e TR# (DRMS Use only) <br />Permittee: CITY o F <br />Operator (If Other than Permittee): <br />Permittee Representative: <br />kE,Ly <br />-245.s 61401+ <br />TRO3 <br />Please provide a brief description of the proposed revision: G(%rEd Co A rept_ P. 111 -7t) <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fec and submit it with <br />your request for a Technical_ Re_viSion..____.----- <br />Permit <br />Type Required TR Fee Submitted lark only one) <br />I IOc, 111, 112 construction <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) <br />110d. 112d(1.2 or 3) <br />$175 <br />$1006 <br />n <br />n <br />✓ Compliance <br />✓ i Violation -MV-1995-048 <br />