Laserfiche WebLink
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203 Phone (303) 866-3567 <br />Today's date: <br />TEMPORARY CESSATION NOTICEQECgI%ED <br />(mining activities temporarily cease for more than a one -Aar period) <br />11-09-2015 NOV 1$ 2015 <br />Permit number: M- 2009-076 Site <br />County: Clear Creek <br />Hukill Gulch Millsit N.�R�"""p` <br />name: y8, } $AFE Y <br />Permittee making request: Venture Resources Inc. <br />Operator (if other than permittee): <br />TC number: (DRMS use onl <br />TCO1 <br />Date the initial five-year period of Temporary Cessation begins: 09-30-2015 <br />Reason mining activities (materials extraction, processing, hauling) have ceased: <br />The price of gold and silver have declined to the point where it is uneconomic to operate <br />a small mill. <br />Description of plan to resume operations: <br />As soon as the economic conditions improve enough to show a small profit Venture resources will resume operations. <br />Description of plan to meet performance standards of Rule 3.1 during temporary cessation (reclamation, weed control, <br />monitoring, signs, markers, etc.): <br />During temporary cessation Venture Resources will monitor the ground water with 2 wells on a quarterly basis and report the findings to DRMS, a <br />weed control program will be initiated and maintained, and all signs and markers will be maintained. <br />Number of affected acres: O <br />Amount of financial warranty (bond) on deposit with the state: $ 96, 827.69 <br />Required fees for Temporary Cessation by permit type (please mark the correct fee and submit it with this request <br />for Temporary Cessation): <br />Permit type <br />Construction Materials <br />Hard Rock/ Metal Mining <br />Required TR fee Submitted (mark only one) <br />$144 <br />$115 <br />El <br />The above -referenced permit has entered Temporary Cessation. This site has reserves remaining to be mined. <br />Operator's signature: <br />Please note: <br />1. While in Temporary Cessation, the operator must continue to <br />maintaining the site, and must continue to file an annual rept <br />✓ Compliance <br />✓ NO Violations <br />